Welcome to Greene County’s Fiscal Year 2022 RAISE Grant application website.

History

Since 2004, Greene County residents have consistently requested multimodal pathways that connect the rural two-thirds of the county with the economic centers of the Town of Stanardsville and the Ruckersville U.S. 29 corridor. Tourism has become a major economic driver in the region and the coronavirus pandemic put a spotlight on the need for more outdoor recreational activities in Greene County.

Purpose

Greene County has submitted to the U.S. Department of Transportation a Rebuilding American Infrastructure with Sustainability and Equity (RAISE) planning grant for fiscal year 2022. The goal of the grant is to create a regional comprehensive multimodal transportation plan for the County of Greene and the Town of Stanardsville. Activities and Scope of the work include:

Background Data Collection, 3-6 months:

  • Project Study Area
  • Planimetric data (topography, location of rivers, streams, wetlands, buildings and roads
  • Master plan/zoning information
  • Traffic counts
  • Ridership forecasts
  • Other transportation projects or planning efforts in the study area
  • Environmental features
  • Noise sensitive locations
  • Flood plain areas
  • Existing accident data, road geometry, traffic controls and so forth

Scoping, 1-6 months:

  • Confirming the project purpose and need
  • Beginning environmental review process
  • Determine level of environmental document and need for water quality permits
  • Identify stakeholders
  • Establish project team
  • Hold an initial scoping team meeting
  • Develop an initial design
  • Hold first public hearing

Preliminary Engineering Phase, 8-12 months:

  • Feasibility study developed
  • NEPA studies conducted
  • Design of roadway, structures, and bridges
  • Traffic control devices
  • Equity analysis
  • Value engineering to identify function and worth of the project
  • Determining right of way and utility impacts
  • Public hearing

Environmental engineering, 6 months:

  • Environmental studies completed on preferred design
  • Obtain design approval from the Commonwealth Transportation Board (must approve before any right of way acquisition can begin)
  • Final Right-of-Way Plan developed, including appraisal of the land

Post-Assessment, 6 months:

  • Present plan and to Board of Supervisors and VDOT & CTB

Documents & Resources

Below, please find the links to all the studies referenced in the application narrative, which is also below. Additionally, letters of support for the project are below.

County of Greene

Greene County VirginiaGreene County is a county in central Virginia in the eastern United States. Greene County was established in 1838. Its county seat is Stanardsville.

Learn more about Greene County.

Contact

  This email address is being protected from spambots. You need JavaScript enabled to view it.

  434-985-5201

  Fax: 434-985-3705

  40 Celt Road, Stanardsville, VA 22973


Contact a County Department